BCN 5715
1st Assignment
Construction Labor
Job Description
Your first assignment is to a develop
job description for one of the following positions: project manager,
superintendent or project engineer (all employees of a general contractor). Each of these individuals will be assigned to
a particular project. The project is a $37
million water treatment facility. The general
contractor will self-perform the site work, foundation work and the cast-in-place
concrete work, representing 39% of the total construction cost. There will be 14 subcontractors on the
project. This facility is located north
of the downtown area of
Before you begin, draw a small organizational chart of the project showing the relative positions of all major jobsite salaried personnel employed by the general contractor. With this organizational chart in mind, draft a job description for one of the positions. These descriptions will be used to provide guidance to the jobsite personnel when they perform their duties and they will also serve as a means by which performance evaluations will be made.
The job description is to be submitted in hardcopy at the beginning of class on September 5. Be sure to keep an electronic copy of the letter for subsequent reference.